
Add to Cart
Automatic Equipment Metal Cage Steel Structure Broiler Chicken Poultry House
The automatic egg laying equipment not only saves a lot of manpower, but also saves about half of the land. A chicken house with 100000 laying hens must adopt 8-layer-by-layer feeding equipment with temperature control system, defecation system, feeding system and egg collection system.
Advantages | |
Faster installation | Single source responsibility |
Lower cost | Flexibility in expansion |
Large clear spans | Quality control |
Low maintenance | Energy efficient roof and wall systems |
Architectural versatility | Optimized design of steel reducing weight |
Quick delivery and Quick turn-key construction. | Water-tight roofs & wall coverings |
Pre-painted and has low maintenance requirement. | The building can be dismantled and relocated easily. |
Clear spans up to 100m without internal columns | Flexibility in building dimensions |
Fixed deadlines and costs | |
Weather-tight roof and wall coverings with accessories for long maintenance free exteriors. |
A computer can make a clear view of the production situation of the whole chicken house at a glance. Not only that, the automatic temperature and humidity control equipment enables the heating, ventilation, temperature and humidity control of the chicken house to be monitored by computer. If the temperature of the chicken house is set to 22 ºC, and it goes up and down more than two degrees, the alarm system will sound. In addition, you can use your mobile phone to remote override. When you have a meeting in Beijing, you can turn on your mobile phone to control the chicken farm far away.
With the development of science and technology, the automatic operation of chicken has been realized from feeding, drinking water, temperature regulating, egg picking, packing and automatic defecation. Of course, the egg is not simply collected. The egg needs to go through 6 passes, including 45 ºC - 50 ºC high-pressure water washing, cold air drying, ultraviolet eggshell sterilization, sonar egg detection, 5000 Watt spectral blood egg detection, electroeye weight grading, and then air drying , waxing, and finally grading packing and packaging, the whole process of automation.
The central control system of the whole chicken house will be unified into a cloud platform to realize one person's management of 100000 chickens! Cloud platform is not only to increase the number of laying hens in storage to improve production and improve the efficiency of artificial breeding. These big data can match the best data, which is much smarter than human brain.
Packaging&Shipping
The packing method for main steel frame use steel pallet, This method packing can better protect the steel frame, and alos the loading and unloading will be fast and convenient since it could be taken as a whole.(see attached photo). The best advantage can save the quantity of shipping contaier, so it will save the cost of ocean freight, save unlading time and cost.
Erection
Upon customer request, we could send our engineer to guide the installation, or a small team to install at the same time, teaching local workers to install, or enough workers to install all the goods by ourselves. It depends on whether the cost is economic.
Finished Projects Showcase
Welcome to visit us for further negotiate
After Sales Service
First:erection guidance and commissioning
1. after the delivery of the steel structure warehouse, provide professional installation team or detailed and clear installation guide manual to assist the customer in the correct installation.
2. if the customer has problems in the process of self-installation, our technical personnel will respond to the consultation within 24 hours and conduct remote guidance through telephone and video to ensure the smooth installation work.
3. for large-scale or complex steel structure warehouse installation projects, technical personnel can be sent to the site for on-site guidance and supervision, ensure that the installation quality conforms to the standards, and timely detect and solve the problems in the installation process.
Second:Quality assurance and maintenance services
1. define the quality guarantee period of steel structure warehouse. In general, the quality guarantee period of the main structure can be set for 20 years.
2. establish a quick response mechanism. After the customer discovers the quality problem and notifies us, we will get in touch with the customer within 24 hours, understand the problem in detail, and formulate the maintenance plan within 3-5 working days.
3. maintenance personnel have professional steel structure maintenance skills and rich experience, equipped with complete maintenance tools and materials, ensure the maintenance work is efficient and high-quality, and minimize the impact on the normal use of the warehouse.
Third:regular follow-up visits and maintenance suggestions
1. make regular return visits within six months after the delivery of the steel structure warehouse, understand the experience and problems encountered by customers in the process of use, and actively ask whether the structure is abnormal, such as shaking, abnormal noise, corrosion, etc.
2. according to the return visit situation, it provides targeted maintenance Suggestions for customers, including regular inspection of the connecting parts of steel structure, maintenance of corrosion protection coating, inspection and replacement of vulnerable parts, etc., so as to help customers extend the service life of the warehouse and ensure its safety and stability.
3. provide customers with a detailed maintenance manual covering daily maintenance points, regular inspection projects, maintenance cycles and emergency treatment measures under special circumstances, and guide customers to maintain their own maintenance.
Fourth:sustomer training and technical support
1. provide free training services for warehouse managers and operators of customers, The content includes the safe use specification of steel structure warehouse, equipment operation process (such as equipment lifting, ventilation equipment, etc.), structural characteristics and matters needing attention, etc., to ensure that customers can use the warehouse correctly and safely.
2. regularly hold technical exchange activities or online seminars to introduce the latest technology development, industry dynamics and our new products and services in the field of steel structure warehouse, so as to promote long-term technical cooperation and exchange with customers.
Fifth:customer feedback and continuous improvement
1. attach importance to customer feedback, establish a perfect customer feedback collection mechanism, and collect customers' opinions and Suggestions on product quality, after-sales service quality, usage experience and other aspects through questionnaire survey, customer visit and after-sales service evaluation.
2. carefully analyze and evaluate the problems and Suggestions of customer feedback, timely formulate improvement measures, and feedback the improvement results to customers, so that customers can feel our attention to them and the sincerity of continuous optimization of products and services.