Qingdao KXD Steel Structure Co., Ltd

Qingdao KXD Steel Structure Co., Ltd

Manufacturer from China
Verified Supplier
1 Years
Home / Products / Steel Commercial Buildings /

Quick Assembled Pre-Engineered Steel Structure Prefab Office Shopping Mall

Contact Now
Qingdao KXD Steel Structure Co., Ltd
Visit Website
City:qingdao
Province/State:shandong
Country/Region:china
Contact Person:MrsCindy
Contact Now

Quick Assembled Pre-Engineered Steel Structure Prefab Office Shopping Mall

Ask Latest Price
Video Channel
Brand Name :KXD
Model Number :kxd-s0760
Certification :SGS / ISO/ BV
Place of Origin :China
MOQ :200 Square Meters
Price :US$70.00
Payment Terms :L/C,T/T
Supply Ability :5000 Ton Per Month
Packaging Details :Package Size 11900mm * 2300mm * 2500mm Package Gross Weight 22000.000kg
Transportation :Convenient
Energy Efficiency :High
Usage :Versatile
Customization Options :Wide range
Insulation :Excellent
Sustainability :Eco-friendly
Design :Modular/Customizable
Durability :High
Steel Type :Q235 Q345
Service :Design,Product,Erection,Transportation,Product Maintenance,Commissioning
Connection Method :Bolting
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Basic Info.

Model NO.
kxd-s0760
Type
Single-Storey Warehouse
Installation
Techinical Guide or Turnkey Projects
Steel Material
GB/Anis/BS/DIN/Uni
Profiles
H / I / C / Z / U Sectional Steel
Structural Frame
Steel Column, Steel Beam, Steel Truss
Connection
High Strength Bolts
Bolts
Galvanized, Dacromat, Geomet
Coating
Alkyd / Epoxy /Hot-DIP Galvanize
Colors
Custom as Demands
Ventilation
Ridge Ventilator ; Ventilated Fan
Day Light Panel
High Quality Type
Roof / Wall Cladding
Optional (Steel Sheet or Insulated Sandwich Panel)
Insulation
EPS, Glasswool, Rockwool, PU
Crane
Optional (1t ~ 20t)
Door
Security Door, Rolling Shutter, Sliding Door
Decoration
Custom Available
Transport Package
Seaworthy Package
Specification
SGS / ISO/ BV
Trademark
KXD
Origin
China
HS Code
7308900000
Production Capacity
5000 Ton Per Month

Packaging & Delivery

Package Size
11900mm * 2300mm * 2500mm
Package Gross Weight
22000.000kg

I. Construction Efficiency: Industrial Prefabrication and Rapid Deployment

Modular Production, Compressed On-Site Assembly Cycle

  • Steel components (columns, beams, trusses) and enclosure systems (color steel plates, glass curtain walls) are fully prefabricated in factories with an accuracy error ≤2mm. On-site quick connection via bolts achieves a main structure installation speed of 500–1,000 per day (traditional concrete structures require 10–15 days per 1,000).
  • Typical Case: A 20,000 shopping mall took only 45 days from foundation to topping out, shortening the construction period by 60% compared to traditional methods, and generating approximately ¥3 million in early opening rental revenue.

Full-Discipline Collaborative Design to Avoid Construction Conflicts

  • BIM technology is used for integrated pipeline design, simulating the spatial layout of steel structures with mechanical, electrical, and fire protection systems in advance to achieve zero on-site collision rework and reduce design change costs by 10%–15%.
  • Quick Assembled Pre-Engineered Steel Structure Prefab Office Shopping Mall

II. Spatial Performance: Flexible Layout and Commercial Adaptability

Large-Span Column-Free Space to Enhance Commercial Utilization

  • Steel frame spans can reach 15–30 meters (e.g., bowstring girder structures), with unobstructed interiors for free division of complex formats like retail areas, dining zones, and atriums. The usable area rate is 8%–12% higher than concrete structures (an 800–1,200 increase for a 10,000 project).
  • Application Scenario: Open atrium designs accommodate large-scale promotions, with floor loads ≥3.5kN/ to meet installation requirements for heavy equipment (e.g., escalators, freight elevators).
  • Quick Assembled Pre-Engineered Steel Structure Prefab Office Shopping Mall

Flexible Floor Height and Load Adjustment

  • Standard floor heights of 4.5–6 meters can be customized for different formats (e.g., reserved smoke exhaust spaces in dining areas). Floor live loads can be upgraded from 2.0kN/ (office areas) to 5.0kN/ (warehousing areas) to adapt to future format adjustments.
  • Quick Assembled Pre-Engineered Steel Structure Prefab Office Shopping Mall

III. Comprehensive Benefits: Cost Optimization and Long-Term Value

Reduced Lifecycle Costs

  • Initial Cost: Comprehensive costs are 15%–25% lower than steel-concrete structures (including foundation and decoration). For a 10,000 project, investment savings are approximately ¥2–3 million.
  • Post-Construction Maintenance: Steel structure anti-corrosion cycles last 15–20 years (hot-dip galvanizing + fluorocarbon paint process), with maintenance costs 30% lower than concrete curtain walls. Steel recycling accounts for 20% of value (demolition recycling revenue: ¥500,000–800,000 per 10,000).

Green Energy Efficiency and Policy Advantages

  • Enclosure systems use double-layer hollow Low-E glass + rock wool insulation (thermal transmittance ≤1.5W/(·K)).
  • Dust emissions during construction are reduced by 70%, and construction waste is reduced by 80%, meeting environmental regulations in first-tier cities and avoiding construction delays due to dust control.
  • Quick Assembled Pre-Engineered Steel Structure Prefab Office Shopping Mall

IV. Structural Safety: Seismic/Wind Resistance and Durability

High Seismic Fortification Capability

  • Adopting steel frame-bracing systems, capable of withstanding 7–8 degrees of seismic intensity (inter-story drift angle ≤1/250). Wind load design values of 0.5–0.75kN/ (up to 1.0kN/ in coastal areas), with rigid connections between wind-resistant columns and roof trusses to reduce glass curtain wall damage risks during typhoons.

Industrial-Grade Material Durability

  • Main structures use Q355B low-alloy high-strength steel (yield strength ≥355MPa) with welding quality above Grade II (ultrasonic flaw detection pass rate ≥95%), designed for a service life of 50 years, far exceeding temporary building standards.

V. Commercial Adaptability: Rapid Iteration and Brand Display

Demountable Renovation for Format Upgrades

  • Steel structure modules can be quickly disassembled and reassembled via bolts. For example, converting an office area to a retail space takes only 2 weeks, saving 80% of time compared to traditional renovations, meeting dynamic tenant adjustment needs in commercial complexes.

Modern Facade Design to Strengthen Brand Image

  • Supports diverse facades such as full glass curtain walls, metal perforated panels, and customized LOGO shapes. Factory prefabrication enables complex curved designs (e.g., arcs, hyperboloids), enhancing project recognition and achieving rent premiums of 10%–15%.

VI. Typical Application Scenarios

  • Urban Commercial Complexes: E.g., shopping malls above subway stations, using steel structures for rapid topping out to occupy prime locations, paired with glass curtain walls to create landmark buildings.
  • Temporary Commercial Spaces: Temporary structures like exhibition halls and pop-up stores, with a construction cycle ≤15 days, demountable relocationafter events, and a reuse rate ≥85%.
  • Industrial Park Support Facilities: Office-commercial hybrid spaces in industrial parks to meet immediate consumption needs of enterprise employees, with a construction cycle 50% shorter than traditional models.

Conclusion: The Efficiency Revolution in Commercial Real Estate

Quick-assembled pre-engineered steel structure office shopping malls reshape commercial real estate development with "industrial speed + flexible space + sustainable value", especially suitable for time-sensitive urban core plots, high-turnover commercial projects, and green building demonstration projects. Their technical advantages lie not only in the "speed" of construction but also in the dynamic response capability to commercial demands throughout the lifecycle, making them a key trend in modern commercial space upgrading I. Construction Efficiency: Industrialized Prefabrication and Rapid Implementation

1. Modular Production with Compressed On-Site Assembly Cycles

  • Steel components (columns, beams, trusses) and enclosure systems (color steel panels, glass curtain walls) are prefabricated in factories with precision errors ≤2mm. On-site bolted connections enable main structure installation speeds of 500-1,000/day (compared to 10-15 days/1,000 for traditional concrete structures).
  • Case Study: A 20,000 shopping mall achieved foundation-to-capping in just 45 days, 60% faster than conventional methods, generating ~¥3 million in early rental revenue.

2. Multi-Disciplinary Collaborative Design to Avoid Construction Conflicts

  • BIM technology integrates pipeline designs, simulating spatial layouts of steel structures, MEP, and fire systems to eliminate on-site collisions, reducing design 变更 costs by 10%-15%.

II. Spatial Performance: Flexible Layouts and Commercial Adaptability

1. Large-Span Column-Free Spaces for Enhanced Commercial Utilization

  • Steel frames achieve spans of 15-30 meters (e.g., cable-stayed structures), enabling unobstructed retail, dining, and atrium zones. Space efficiency is 8%-12% higher than concrete structures (e.g., 800-1,200 additional usable area in a 10,000 project).
  • Application: Open atriums accommodate large-scale promotions, with floor loads ≥3.5kN/ supporting heavy equipment (escalators, freight elevators).

2. Adjustable Floor Heights and Load Capacities

  • Standard floor heights of 4.5-6 meters are customizable (e.g., kitchen exhaust 预留 in dining areas). Live loads range from 2.0kN/ (offices) to 5.0kN/ (warehouses), adapting to future 业态 changes.

III. Comprehensive Benefits: Cost Optimization and Long-Term Value

1. Reduced Lifecycle Costs

  • Initial Investment: 15%-25% lower than steel-concrete structures (including foundations and finishes), saving ~¥2-3 million for a 10,000 project.
  • Maintenance: 15-20-year anti-corrosion cycles (hot-dip galvanizing + fluorocarbon coating) reduce maintenance costs by 30%. Steel recycling yields 20% residual value (~¥500,000-800,000 per 10,000 at demolition).

2. Green Energy Efficiency and Policy Advantages

  • Enclosure systems use double-glazed Low-E glass + rock wool insulation (thermal conductivity ≤1.5W/(·K)), reducing HVAC energy consumption by 35% and qualifying for green building subsidies (¥50-100/).
  • Environmental Compliance: 70% less dust emissions and 80% reduced construction waste align with first-tier city regulations, avoiding delays from dust control measures.

IV. Structural Safety: Earthquake/Wind Resistance and Durability

1. High-Seismic Resistance

  • Steel frame-brace systems withstand 7-8 magnitude earthquakes (interstory drift ≤1/250) and design wind loads of 0.5-0.75kN/ (1.0kN/ in coastal areas), minimizing glass curtain wall damage through rigid connections between wind columns and roof trusses.

2. Industrial-Grade Material Durability

  • Primary structures use Q355B high-strength low-alloy steel (yield strength ≥355MPa) with weld quality 等级 II+ (ultrasonic testing pass rate ≥95%), ensuring a 50-year design life exceeding temporary building standards.

V. Commercial Adaptability: Rapid Iteration and Brand Enhancement

1. Demountable Modular Upgrades

  • Steel modules enable 2-week conversions from offices to retail spaces (80% faster than traditional renovations), meeting dynamic leasing requirements in commercial complexes.

2. Contemporary Façade Design for Brand Differentiation

  • Support for diverse exteriors (full-glass curtain walls, perforated metal panels, custom logos) with factory-precast complex geometries (arcs, hyperboloids), boosting project visibility and commanding 10%-15% rental premiums.

VI. Typical Application Scenarios

  • Urban Commercial Complexes: Metro-connected malls leveraging rapid steel construction to secure prime locations, combined with glass facades for landmark status.
  • Temporary Commercial Spaces: Exhibition halls and pop-up stores erected in ≤15 days, ≥85% reusable after disassembly.
  • Industrial Park Amenities: Office-retail hybrids in industrial zones, delivered 50% faster than conventional methods to serve employee needs.

Conclusion: A Revolution in Commercial Real Estate Efficiency

The rapid-assembly pre-engineered steel structure mall redefines commercial real estate development through "industrialized speed + flexible spaces + sustainable value". Ideal for time-sensitive urban cores, high-turnover projects, and green building initiatives, its advantages extend beyond construction speed to lifecycle adaptability, positioning it as a key trend in modern commercial space evolution.


We will provide the most comprehensive services to ensure your satisfaction.


Quick Assembled Pre-Engineered Steel Structure Prefab Office Shopping Mall


Quick Assembled Pre-Engineered Steel Structure Prefab Office Shopping Mall


Quick Assembled Pre-Engineered Steel Structure Prefab Office Shopping Mall


If you have any requests, please feel free to contact us at any time. We are more than happy to provide solutions and establish cooperation with you.

Inquiry Cart 0